Wednesday saw us make a journey up to Blyth, a coastal town not far north of Newcastle. Found where the River Blyth meets the North sea Blyth grew rapidly in the 19th and early 20th century; by the early 20th century Blyth boasted one of the largest shipbuilding yards on the North East coast, with five dry docks and four building slipways. The economic prosperity of Blyth was also much aided by a thriving local coal industry, and to a lesser extent salt industry – all meriting Blyth worthy of a visit, but on this occasion, we were visiting for a much different purpose…

Blyth is now home to the ‘Offshore Renewable Energy Catapult’ of which we were kindly given a tour.
blyth-sign

The 20 acre site is a hotbed for R&D and testing of offshore renewable energy technologies, in particular offshore wind, although to a lesser extent tidal and wave energy technologies as well. Sadly pictures were not allowed and so we can only attempt to describe the scale of the facilities with words – simply enormous! As the sign above suggests the site is home to a 100m blade test facility; which shakes, twists and torments the biggest wind turbine blades in the world to their limits, to make sure they are performing to designed operational parameters and are fit for deployment…

hull-the-blade-with-credit

A 75m Siemens offshore wind turbine blade on display in Hull this week; no co-incidence in being in Hull town centre; Siemens is investing £160 million in a blade manufacturing plant in the town, thought to bring with it 1,000 jobs (Read more).

As well as blade testing the Catapult also has a 15MW nacelle test facility under development, which as the name suggests will be able to test the next generation of the biggest nacelles in the world – this means being able not just to drive 15MW of power through the test nacelle but also vary the application of this massive load; to simulate unequal loading that can be felt by turbine nacelles by gusty and turbulent winds and apply it at a slight angle; to test the resilience of the unit to the limit and make sure it will survive and operate as intended in the tough conditions of an offshore wind farm.

vesta-8mw-nacelle-on-ship

An 8MW Vesta V164 being loaded onto a ship – the unit weighs over 400 tonnes and will be mounted at a height of about 120m above sea level.

size-of-biggest-wind-turbine-today

Adding context; the size of today’s largest wind turbines…

Following our site tour we loaded back up into the bus for a look a closer look around Blythe, including a top-notch fish and chips lunch on the beach, in the sun too! Can’t complain…

blyth-beach-shot

Thank you Catapult for your time and for the fascinating tour of your facility.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s